cetan's weblog a man, no plan, a blog, golbanalponnama.

13Aug/100

Expansion

The major north/south road to our neighborhood is loaded with construction this summer (and next) but this is a good thing.

Not only are they putting in turn lanes and lights at much needed locations, they’re also building a bike path from, essentially, the high school to Veterans Acres Park. Which means we’ll (eventually) be able to ride our bikes on neighborhood roads almost the entire way to the park with only a short section of a “can-be-busy” road to ride on.

But it’s a bit of a ways off...not until next summer will the bike path be ready, baring any more delays from weather or labor disputes.

The one down side to all this construction was the need to remove a lot of trees along Walkup. Some of the trunks were easily 5 feet in diameter and the loss has removed a lot of shade and beauty from the roadway. So, that’s a bummer. Maybe they’ll plant some new trees along the bike path (one can hope).

Overall progress can be tracked on the construction project’s website:
http://www.walkuproad.info/

Comments (0) Trackbacks (0)

No comments yet.


Leave a comment


Trackbacks are disabled.